* Cantinho Satkeys

Refresh History
  • j.s.: try65hytr a todos  49E09B4F
    07 de Novembro de 2024, 18:10
  • JPratas: dgtgtr Pessoal  49E09B4F k7y8j0
    06 de Novembro de 2024, 17:19
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  4tj97u<z
    03 de Novembro de 2024, 10:49
  • j.s.: bom fim de semana  43e5r6 49E09B4F
    02 de Novembro de 2024, 08:37
  • j.s.: ghyt74 a todos  4tj97u<z
    02 de Novembro de 2024, 08:36
  • FELISCUNHA: ghyt74   49E09B4F  e bom feriado   4tj97u<z
    01 de Novembro de 2024, 10:39
  • JPratas: try65hytr Pessoal  h7ft6l k7y8j0
    01 de Novembro de 2024, 03:51
  • j.s.: try65hytr a todos  4tj97u<z
    30 de Outubro de 2024, 21:00
  • JPratas: dgtgtr Pessoal  4tj97u<z k7y8j0
    28 de Outubro de 2024, 17:35
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  k8h9m
    27 de Outubro de 2024, 11:21
  • j.s.: bom fim de semana   49E09B4F 49E09B4F
    26 de Outubro de 2024, 17:06
  • j.s.: dgtgtr a todos  4tj97u<z
    26 de Outubro de 2024, 17:06
  • FELISCUNHA: ghyt74   49E09B4F  e bom fim de semana
    26 de Outubro de 2024, 11:49
  • JPratas: try65hytr Pessoal  101yd91 k7y8j0
    25 de Outubro de 2024, 03:53
  • JPratas: dgtgtr A Todos  4tj97u<z 2dgh8i k7y8j0
    23 de Outubro de 2024, 16:31
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    23 de Outubro de 2024, 10:59
  • j.s.: dgtgtr a todos  4tj97u<z
    22 de Outubro de 2024, 18:16
  • j.s.: dgtgtr a todos  4tj97u<z
    20 de Outubro de 2024, 15:04
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  101041
    20 de Outubro de 2024, 11:37
  • axlpoa: hi
    19 de Outubro de 2024, 22:24

Autor Tópico: Phased Construction For Construction Managers  (Lida 51 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Online mitsumi

  • Moderador Global
  • ***
  • Mensagens: 115915
  • Karma: +0/-0
Phased Construction For Construction Managers
« em: 11 de Abril de 2023, 04:18 »

Phased Construction For Construction Managers
Published 4/2023
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
Language: English | Size: 829.30 MB | Duration: 1h 27m

A Construction Manager's Comprehensive Commentary on Phased Construction: What a Construction Manager needs to know

What you'll learn
What is a Phased Project
What are some Advantages and Disadvantages
Identify different types of Phased Projects
Identify common issues that affect Phased Projects
Important Factors to Consider
Important Safety Concerns to Consider
Logistics, Logistics, Logistics
Lessons Learned
Requirements
General Commercial Construction Experience
Description
This is an introductory course that will provide the learner with a basic understanding of how to develop and construct a Phased Project. This course was developed by a Construction Manager who has been working in the Design and Construction Industries for over 30 years. His personal experiences helped demonstrate how to effectively develop and construct a Phased Project.The course is divided into several sections which include an Introduction to Phased Projects, identify some Advantages and Disadvantages, identify several different Types of Phased Projects including a Relocation, Expansion with no Renovation, and Expansion with Relocation, and more Complex Phased Projects including Occupied Renovation with Relocation, Occupied Renovation with no Relocation, Full Floor with Relocation, and Full Floor with No Relocation.The course will also review Important Factors to Consider such as Number of Phases, Occupied vs Unoccupied, Using a Swing Space, Displacement, Schedule Impacts, Sequencing of the Phases, Adjacent Work, Temporary Work, Nature of the Work, Means of Egress Changes, Compartmentation, MEP Systems, Fire Alarm Impairments, Fire Protection Impairments, Logistics, Security, and Material Escalations. It will also review Important Safety Concerns to Consider such as Occupants, Visitors, Construction Workers, Means of Egress, Accessibility, Safety Through Design, Hazards, and Buffer Zones, Logistic issues to consider, and review some Lessons Learned from previous projects.Please enjoy the course and let us know if you have any questions or comments.
Overview
Section 1: Introduction
Lecture 1 Introduction
Lecture 2 Types of Phased Projects
Lecture 3 More Complex Phased Projects
Lecture 4 Important Factors to Consider
Lecture 5 Lessons Learned
Lecture 6 Conclusion
This course provides detailed instructions on how to develop and execute a Phased Construction Project for anyone that is working as an Owner, General Contractor, Construction Manager, Site Superintendent, Facility Manager, or Designer.


Download link

rapidgator.net:
Citar
https://rapidgator.net/file/76b27a6f477bc5ba399dc2c0fe0a7dd8/xioku.Phased.Construction.For.Construction.Managers.rar.html

uploadgig.com:
Citar
https://uploadgig.com/file/download/bc677a5367649121/xioku.Phased.Construction.For.Construction.Managers.rar

nitroflare.com:
Citar
https://nitroflare.com/view/7167AB397507DE9/xioku.Phased.Construction.For.Construction.Managers.rar

1dl.net:
Citar
https://1dl.net/5zuupqepdtxc/xioku.Phased.Construction.For.Construction.Managers.rar