* Cantinho Satkeys

Refresh History
  • FELISCUNHA: ghyt74  pessoal  4tj97u<z
    Hoje às 10:38
  • cereal killa:
    19 de Abril de 2025, 21:17
  • j.s.: tenham uma Santa e Feliz Páscoa  49E09B4F 49E09B4F 49E09B4F
    19 de Abril de 2025, 18:19
  • j.s.:
    19 de Abril de 2025, 18:19
  • j.s.: dgtgtr a todos  4tj97u<z 4tj97u<z
    19 de Abril de 2025, 18:15
  • FELISCUNHA: Uma santa sexta feira para todo o auditório  4tj97u<z
    18 de Abril de 2025, 11:12
  • JPratas: try65hytr Pessoal  4tj97u<z classic k7y8j0
    18 de Abril de 2025, 03:28
  • cereal killa: try65hytr malta  classic 2dgh8i
    14 de Abril de 2025, 23:14
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  101041
    13 de Abril de 2025, 11:45
  • j.s.: e um bom domingo de Ramos  43e5r6 43e5r6
    11 de Abril de 2025, 21:02
  • j.s.: tenham um excelente fim de semana  49E09B4F
    11 de Abril de 2025, 21:01
  • j.s.: try65hytr a todos  4tj97u<z
    11 de Abril de 2025, 21:00
  • JPratas: try65hytr  y5r6t Pessoal  classic k7y8j0
    11 de Abril de 2025, 04:15
  • JPratas: dgtgtr A Todos  4tj97u<z classic k7y8j0
    10 de Abril de 2025, 18:29
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    09 de Abril de 2025, 11:59
  • cereal killa: try65hytr pessoal  2dgh8i
    08 de Abril de 2025, 23:21
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  43e5r6
    06 de Abril de 2025, 11:13
  • cccdh: Ola para todos!
    04 de Abril de 2025, 23:41
  • j.s.: tenham um excelente fim de semana  49E09B4F
    04 de Abril de 2025, 21:10
  • j.s.: try65hytr a todos  4tj97u<z
    04 de Abril de 2025, 21:10

Autor Tópico: Calculate Productivity rate: Formwork in construction  (Lida 102 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Online mitsumi

  • Moderador Global
  • ***
  • Mensagens: 119085
  • Karma: +0/-0
Calculate Productivity rate: Formwork in construction
« em: 12 de Julho de 2020, 12:08 »

Calculate Productivity rate: Formwork in construction
Video: .mp4 (1280x720, 30 fps(r)) | Audio: aac, 44100 Hz, 2ch | Size: 526 MB
Genre: eLearning Video | Duration: 7 lectures (53 mins) | Language: English

 Carpenters Man-hours data and calculation for rate of time per surface area obtained

What you'll learn

    My course will give a very simple way to understand how to estimate and calculate the productivity rate of carpenters working on formwork installation till dismantling in construction projects
    I will explain why and how i will calculate those productivity rates.
    I will give a real case project with real data collected from site and important method to calculate the needed productivity rates of labors
    All the explanations will be directly done on site Photos and Excel sheets calculation

Requirements

    The students or Engineers watching this course need to have little idea about construction, which mean that they need to know that in construction, wood or aluminum or even steel formwork is used as a tools to pour concrete inside.

Description

My course will give a very simple way to understand how to estimate and calculate the productivity rate of carpenters working on formwork installation till dismantling in construction projects, based on a real project already completed.

All the explanations will be directly provided based on site Photos and Excel sheets calculation formulas and site data information.

The project under study is a tower of 28 stories where i was directly involved in its construction.

Who this course is for:

    Any student learning civil Engineering, or already graduated and seeking to learn more about construction management.
    Other professionals like planners, estimators, project managers, developers, can also benefit from the information provided in this course to better understand the construction process and the site requirement.
Download link:
Só visivel para registados e com resposta ao tópico.

Only visible to registered and with a reply to the topic.

Links are Interchangeable - No Password - Single Extraction