* Cantinho Satkeys

Refresh History
  • JP: try65hytr Pessoal  4tj97u<z  2dgh8i k7y8j0
    14 de Julho de 2026, 05:28
  • j.s.: ghyt74 a todos
    13 de Julho de 2026, 08:29
  • cereal killa: try65hytr pessoal  r4v8p 4tj97u<z
    08 de Julho de 2026, 22:21
  • JP: dgtgtr Pessoal 4tj97u<z 2dgh8i k7y8j0 r4v8p
    07 de Julho de 2026, 18:29
  • j.s.: tenham um bom domingo  4tj97u<z
    05 de Julho de 2026, 09:39
  • j.s.: ghyt74 a todos  49E09B4F
    05 de Julho de 2026, 09:38
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 r4v8p xe4s
    03 de Julho de 2026, 04:43
  • cereal killa: try65hytr pessoal,esta calor do karago  r4v8p 43e5r6
    01 de Julho de 2026, 22:01
  • j.s.: try65hytr a todos  49E09B4F
    30 de Junho de 2026, 21:02
  • JP: try65hytr Pessoal  4tj97u<z  2dgh8i k7y8j0 r4v8p
    30 de Junho de 2026, 05:31
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 classic
    26 de Junho de 2026, 05:05
  • cereal killa: ghyt74 e continuaçao bom sao joao  wwd46l0'
    24 de Junho de 2026, 12:16
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 xe4s
    24 de Junho de 2026, 04:05
  • FELISCUNHA: ghyt74   4tj97u<z e bom São João  h7i37
    23 de Junho de 2026, 10:55
  • j.s.: dgtgtr a todos  49E09B4F
    20 de Junho de 2026, 15:51
  • FELISCUNHA: ghyt74   49E09B4F  e bom fim de semana  4tj97u<z
    20 de Junho de 2026, 11:31
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0
    19 de Junho de 2026, 04:41
  • romi: Beleza
    19 de Junho de 2026, 04:28
  • cereal killa: try65hytr pessoal  2dgh8i
    18 de Junho de 2026, 23:28
  • JP: dgtgtr Pessoal  2dgh8i k7y8j0 r4v8p
    18 de Junho de 2026, 19:48

Autor Tópico: Calculate Productivity rate: Formwork in construction  (Lida 368 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Online mitsumi

  • Sub-Administrador
  • ****
  • Mensagens: 134583
  • Karma: +0/-0
Calculate Productivity rate: Formwork in construction
« em: 12 de Julho de 2020, 12:08 »

Calculate Productivity rate: Formwork in construction
Video: .mp4 (1280x720, 30 fps(r)) | Audio: aac, 44100 Hz, 2ch | Size: 526 MB
Genre: eLearning Video | Duration: 7 lectures (53 mins) | Language: English

 Carpenters Man-hours data and calculation for rate of time per surface area obtained

What you'll learn

    My course will give a very simple way to understand how to estimate and calculate the productivity rate of carpenters working on formwork installation till dismantling in construction projects
    I will explain why and how i will calculate those productivity rates.
    I will give a real case project with real data collected from site and important method to calculate the needed productivity rates of labors
    All the explanations will be directly done on site Photos and Excel sheets calculation

Requirements

    The students or Engineers watching this course need to have little idea about construction, which mean that they need to know that in construction, wood or aluminum or even steel formwork is used as a tools to pour concrete inside.

Description

My course will give a very simple way to understand how to estimate and calculate the productivity rate of carpenters working on formwork installation till dismantling in construction projects, based on a real project already completed.

All the explanations will be directly provided based on site Photos and Excel sheets calculation formulas and site data information.

The project under study is a tower of 28 stories where i was directly involved in its construction.

Who this course is for:

    Any student learning civil Engineering, or already graduated and seeking to learn more about construction management.
    Other professionals like planners, estimators, project managers, developers, can also benefit from the information provided in this course to better understand the construction process and the site requirement.
Download link:
Só visivel para registados e com resposta ao tópico.

Only visible to registered and with a reply to the topic.

Links are Interchangeable - No Password - Single Extraction