* Cantinho Satkeys

Refresh History
  • FELISCUNHA: dgtgtr   49E09B4F  e bom fim de semana  4tj97u<z
    01 de Agosto de 2026, 12:21
  • JP: try65hytr A Todos  4tj97u<z 2dgh8i k7y8j0 yu7gh8
    31 de Julho de 2026, 05:35
  • j.s.: ghyt74 a todos
    30 de Julho de 2026, 09:51
  • FELISCUNHA: ghyt74  pessoal  49E09B4F
    29 de Julho de 2026, 10:49
  • JP: dgtgtr Pessoal  4tj97u<z 2dgh8i k7y8j0
    27 de Julho de 2026, 19:40
  • j.s.: tenham um excelente domingo  yu7gh8 yu7gh8
    26 de Julho de 2026, 11:29
  • j.s.: ghyt74 a todos  49E09B4F 49E09B4F
    26 de Julho de 2026, 11:28
  • FELISCUNHA: ghyt74  e bom fim de semana  4tj97u<z
    25 de Julho de 2026, 11:29
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 classic
    24 de Julho de 2026, 04:53
  • j.s.: try65hytr a todos  49E09B4F
    22 de Julho de 2026, 21:03
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 yu7gh8
    21 de Julho de 2026, 03:46
  • momo2free: dorcal
    19 de Julho de 2026, 18:10
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  k8h9m
    19 de Julho de 2026, 10:44
  • JP: try65hytr Pessoal  4tj97u<z  2dgh8i k7y8j0
    14 de Julho de 2026, 05:28
  • j.s.: ghyt74 a todos
    13 de Julho de 2026, 08:29
  • cereal killa: try65hytr pessoal  r4v8p 4tj97u<z
    08 de Julho de 2026, 22:21
  • JP: dgtgtr Pessoal 4tj97u<z 2dgh8i k7y8j0 r4v8p
    07 de Julho de 2026, 18:29
  • j.s.: tenham um bom domingo  4tj97u<z
    05 de Julho de 2026, 09:39
  • j.s.: ghyt74 a todos  49E09B4F
    05 de Julho de 2026, 09:38
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 r4v8p xe4s
    03 de Julho de 2026, 04:43

Autor Tópico: LEAP Bridge Concrete CONNECT Edition V20  (Lida 400 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Offline apple2000

  • Membro Satkeys
  • *
  • Mensagens: 18022
  • Karma: +0/-0
LEAP Bridge Concrete CONNECT Edition V20
« em: 22 de Julho de 2020, 15:52 »
LEAP Bridge Concrete CONNECT Edition V20





LEAP Bridge Concrete CONNECT Edition V20 | 1.0 Gb


The LEAP products development team is pleased to announce the availability of LEAP Bridge Concrete V20 (Build 20.00.00.46). This update release contains enhancements and bug fixes.


LEAP Bridge Concrete CONNECT Edition V20 (May28,2020)
Consolidation of LEAP Bridge Concrete in OpenBridge Designer.
This enhancement offers users the capability to leverage the LEAP Bridge Concrete (LBC) with a new consolidated user interface consistent with LEAP Bridge Steel (LBS) in OpenBridge Designer under the BIM workflow. Both LBC and LBS are becoming analytical parts of the new OpenBridge Designer (OBD).
Interoperability to read functional components from OpenBridge Modeler
This enhancement offers the ability of modeling and designing concrete bridges with complex substructure using the functional components under OpenBridge Designer's BIM workflow.
Interoperability to read new substructure alignment from OBM
This enhancement offers the capability to read new substructure alignment options in OpenBridge Modeler under the OpenBridge Designer's BIM workflow.
For the detailed release notes, please see the attached PDF file.




LEAP Bridge Concrete a fully integrated bridge Geometry, Substructure, and Superstructure analysis, design, and rating software for Precast and Cast-in-place (CIP) post-tensioned or reinforced concrete box girder or slab bridges built on falsework. You are joining a select group of professional engineers who use LEAP Bridge to perform efficient and accurate designs everyday. Even if you are new to computer-aided design software, you will find LEAP Bridge Concrete easy to use. If you are an expert, you will appreciate the fully integrated features that make LEAP Bridge Concrete a very powerful design tool.
New Beams Sections in LEAP Bridge Concrete


Bentley Systems, Incorporated. is the global leader dedicated to providing architects, engineers, constructors, and owner-operators with comprehensive architecture and engineering software solutions for sustaining infrastructure. Founded in 1984, Bentley has nearly 3,000 colleagues in more than 45 countries, $500 million in annual revenues, and, since 2001, has invested more than $1 billion in research, development, and acquisitions.
Product: LEAP Bridge Concrete
Version: CONNECT Edition V20 (Build 20.00.00.46)
Supported Architectures: x64
Website Home Page : www.bentley.com
Language: english
System Requirements: PC *
Supported Operating Systems: *
Size: 1.0 Gb


The Bridge products will perform optimally if the recommended System requirements as outlined below are adhered to.
Processor
Intel Pentium-based or AMD Athlon-based processor 2.0 GHz or greater
Operating System
Windows 10 (64-bit), Windows 8 (64-bit), Windows 7 (64-bit)
Memory
8GB minimum, 32 GB recommended
Video
1GB of video RAM or higher recommended
Disk Space
10 GB minimum free disk space




DOWNLOAD LINKS :

Código: [Seleccione]
https://nitroflare.com/view/F7A040F68DBFC46/d9qsd.aLBiSteCE20.rar
https://nitroflare.com/view/8ABB8E2FE2C03D2/d9qsd.LBCCEV20ReleaseNotes.rar

https://rapidgator.net/file/586a7cbffc2837823d24205047d059ff/d9qsd.aLBiSteCE20.rar.html
https://rapidgator.net/file/d4baebefd8f6f0a7390cfe3ce71fcd34/d9qsd.LBCCEV20ReleaseNotes.rar.html