* Cantinho Satkeys

Refresh History
  • FELISCUNHA: ghyt74  pessoal  49E09B4F
    11 de Setembro de 2026, 11:37
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 classic
    11 de Setembro de 2026, 05:33
  • JP: try65hytr Pessoal k7y8j0 2dgh8i k7y8j0 yu7gh8
    08 de Setembro de 2026, 04:15
  • j.s.: dgtgtr a todos  49E09B4F 49E09B4F
    06 de Setembro de 2026, 12:15
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  k8h9m
    06 de Setembro de 2026, 12:02
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 r4v8p
    04 de Setembro de 2026, 04:35
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    03 de Setembro de 2026, 08:38
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 yu7gh8
    01 de Setembro de 2026, 04:12
  • j.s.: try65hytr a todos  49E09B4F
    31 de Agosto de 2026, 20:33
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    26 de Agosto de 2026, 10:51
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 classic
    25 de Agosto de 2026, 04:05
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    21 de Agosto de 2026, 11:28
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 classic
    21 de Agosto de 2026, 05:22
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 43e5r6
    17 de Agosto de 2026, 04:09
  • j.s.: dgtgtr a todos  49E09B4F
    15 de Agosto de 2026, 15:07
  • FELISCUNHA: ghyt74   49E09B4F  e bom fim de semana  4tj97u<z
    15 de Agosto de 2026, 11:45
  • Alberto: Revistas
    15 de Agosto de 2026, 05:32
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0
    14 de Agosto de 2026, 05:05
  • j.s.: try65hytr try65hytr a todos  49E09B4F 49E09B4F
    11 de Agosto de 2026, 20:26
  • JP: try65hytr Pessoal 2dgh8i k7y8j0 r4v8p
    11 de Agosto de 2026, 04:30

Autor Tópico: The BIM Execution Plan for Architects  (Lida 681 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Offline mitsumi

  • Sub-Administrador
  • ****
  • Mensagens: 135144
  • Karma: +0/-0
The BIM Execution Plan for Architects
« em: 29 de Maio de 2019, 20:12 »

The BIM Execution Plan for Architects
MP4 | Video: AVC 1280x720 | Audio: AAC 44KHz 2ch | Duration: 1.5 Hours | 231 MB
Genre: eLearning | Language: English

 BIM has changed how architectural projects are won and produced. A BIM Execution Plan (BIM-EP) is a critical document for standardizing your organization's BIM practices. It can help increase project quality, consistency, and results, while improving your team's efficiency and ability to innovate. Learn how to develop your own BIM Execution Plan by following along with Megan Johnson, Director of BIM at ODELL Associates. Megan begins by introducing the basic definitions of BIM and why the industry has developed the BIM Execution Plan. She then reviews the different topics that should be covered in your documentation: standards for drawing deliverables, model controls and requirements, file formatting and best practices for the design review and design coordination meetings, scheduling and budgeting, permitting, and more. The course closes with a look at a sample BIM Execution Plan, which you can use as a template for your own organization. Plus, learn how to prevent retroactive or retro-BIMing-a wasteful practice of trying to transform 2D drawings into 3D models after the fact.
             

               
 
Download link:
Só visivel para registados e com resposta ao tópico.

Only visible to registered and with a reply to the topic.

Links are Interchangeable - No Password - Single Extraction