* Cantinho Satkeys

Refresh History
  • j.s.: tenham um bom fim de semana,   49E09B4F 49E09B4F
    07 de Fevereiro de 2026, 14:31
  • j.s.: dgtgtr a todos  49E09B4F
    07 de Fevereiro de 2026, 14:30
  • FELISCUNHA: ghyt74  pessoall 49E09B4F
    06 de Fevereiro de 2026, 12:00
  • JPratas: try65hytr A Todos  4tj97u<z  2dgh8i k7y8j0 classic
    06 de Fevereiro de 2026, 05:17
  • joca34: ola amigos alguem tem este cd Ti Maria da Peida -  Mãe negra
    05 de Fevereiro de 2026, 16:09
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    03 de Fevereiro de 2026, 11:46
  • Robi80g: CIAO A TUTTI
    03 de Fevereiro de 2026, 10:53
  • Robi80g: THE SWAP FILM WALT DISNEY
    03 de Fevereiro de 2026, 10:50
  • Robi80g: SWAP
    03 de Fevereiro de 2026, 10:50
  • j.s.: dgtgtr a todos  49E09B4F
    02 de Fevereiro de 2026, 16:50
  • FELISCUNHA: ghyt74  pessoal   4tj97u<z
    02 de Fevereiro de 2026, 11:41
  • j.s.: try65hytr a todos  49E09B4F
    29 de Janeiro de 2026, 21:01
  • FELISCUNHA: ghyt74  pessoal  4tj97u<z
    26 de Janeiro de 2026, 11:00
  • espioca: avast vpn
    26 de Janeiro de 2026, 06:27
  • j.s.: dgtgtr  todos  49E09B4F
    25 de Janeiro de 2026, 15:36
  • Radio TugaNet: Bom Dia Gente Boa
    25 de Janeiro de 2026, 10:18
  • FELISCUNHA: dgtgtr   49E09B4F  e bom fim de semana  4tj97u<z
    24 de Janeiro de 2026, 12:15
  • Cocanate: J]a esta no Forun
    24 de Janeiro de 2026, 01:54
  • Cocanate: Eu tenho
    24 de Janeiro de 2026, 01:46
  • Cocanate: boas minha gente
    24 de Janeiro de 2026, 01:26

Autor Tópico: Engineering Cost Estimation-Brownfield Process Plants  (Lida 167 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Offline mitsumi

  • Sub-Administrador
  • ****
  • Mensagens: 129146
  • Karma: +0/-0
Engineering Cost Estimation-Brownfield Process Plants
« em: 08 de Novembro de 2022, 11:35 »

Engineering Cost Estimation-Brownfield Process Plants
Last updated 8/2021
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
Language: English | Size: 549.26 MB | Duration: 0h 52m

Deliverable based & Lump sum man-hour costing

What you'll learn
Process Plant Engineering man-hour & cost estimation
Requirements
Basic knowledge on scheduling & cost estimation
Description
In chemical industry, a design and engineering company engaged in EPC of process plants is often called upon to submit their technical & commercial proposal for providing engineering services in order to carry out expansion / revamp of an existing facility or carryout modifications / upgrading to meet the stricter norms for effluent emission. These type of projects are generally called brown field projects as opposed to green field projects wherein the new project is implemented starting from scratch in a new barren plant site .This course is intended for chemical or mechanical engineers who have a couple of years of exposure to process plant engineering and field experience in a process plant so that they are aware of what is meant by a deliverable pertaining to various plant and equipment in a chemical plant. In many instances customer may not have detailed scope of work for the brown field project and will just send a brief email enquiry to EPC company to quote their fees and scope of work for the project. When the company submits its bid for EPC on this basis it is called "SUO MOTO' bid implying that action is taken by them on their own.For example, customer will inform that they want expansion/automation of an existing Reaction facility or expansion / replacement of am existing drying system or automatic bagging and transfer system with silo storage etc. Also they may ask for feasibility report with budgetary cost estimation for the project in order to get management approval for funding and implementation.When such a request comes from a customer, the engineering company have to prepare the bid for engineering on their own defining the expected scope of work / list of deliverables to be submitted and the estimated man-hour cost and timeline for executing the project. This activity needs lot of input by way of existing drawings / documents or other information to realistically estimate the EPC cost.This course attempts to give a guided path and method to the cost estimation engineer to define the scope of work , estimate the man-hour cost and submit the bid in a reliable approach.. The course will be useful to chemical or mechanical engineers who wish to work as scheduling and cost estimation engineer executing EPC of process plants.
Overview
Section 1: Introduction
Lecture 1 Introduction
Section 2: EPC Bid- Activities for costing
Lecture 2 Site Survey,, Document Retrieval & Reports
Lecture 3 Scope of Work, Deliverables & Schedule
Lecture 4 Scope Matrix
Lecture 5 Detailed, Lumpsum Cost Estimation and WBS
Lecture 6 Techno-Commercial Proposal & Software Tools
Chemical & Mechanical Engineers in EPC Companies


Download link

rapidgator.net:
Citar
https://rapidgator.net/file/6e251b0e31a11a978e5d542cd5306bc7/nawgz.Engineering.Cost.EstimationBrownfield.Process.Plants.rar.html

uploadgig.com:
Citar
https://uploadgig.com/file/download/e347f2117c6272cF/nawgz.Engineering.Cost.EstimationBrownfield.Process.Plants.rar

nitroflare.com:
Citar
https://nitroflare.com/view/40DF3C3DB4ADB36/nawgz.Engineering.Cost.EstimationBrownfield.Process.Plants.rar

1dl.net:
Citar
https://1dl.net/5grgmdrvrlbs/nawgz.Engineering.Cost.EstimationBrownfield.Process.Plants.rar.html