* Cantinho Satkeys

Refresh History
  • joaozinho_bosco: wwd46l0'
    16 de Setembro de 2026, 13:45
  • joaozinho_bosco: boas tarde
    16 de Setembro de 2026, 13:43
  • j.s.: bom dia a todos  49E09B4F 49E09B4F
    15 de Setembro de 2026, 11:54
  • FELISCUNHA: ghyt74  pessoal  49E09B4F
    15 de Setembro de 2026, 10:47
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 r4v8p
    15 de Setembro de 2026, 05:01
  • FELISCUNHA: ghyt74  pessoal  49E09B4F
    11 de Setembro de 2026, 11:37
  • JP: try65hytr Pessoal  4tj97u<z 2dgh8i k7y8j0 classic
    11 de Setembro de 2026, 05:33
  • JP: try65hytr Pessoal k7y8j0 2dgh8i k7y8j0 yu7gh8
    08 de Setembro de 2026, 04:15
  • j.s.: dgtgtr a todos  49E09B4F 49E09B4F
    06 de Setembro de 2026, 12:15
  • FELISCUNHA: Votos de um santo domingo para todo o auditório  k8h9m
    06 de Setembro de 2026, 12:02
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 r4v8p
    04 de Setembro de 2026, 04:35
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    03 de Setembro de 2026, 08:38
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 yu7gh8
    01 de Setembro de 2026, 04:12
  • j.s.: try65hytr a todos  49E09B4F
    31 de Agosto de 2026, 20:33
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    26 de Agosto de 2026, 10:51
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 classic
    25 de Agosto de 2026, 04:05
  • FELISCUNHA: ghyt74  pessoal   49E09B4F
    21 de Agosto de 2026, 11:28
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 classic
    21 de Agosto de 2026, 05:22
  • JP: try65hytr Pessoal 4tj97u<z 2dgh8i k7y8j0 43e5r6
    17 de Agosto de 2026, 04:09
  • j.s.: dgtgtr a todos  49E09B4F
    15 de Agosto de 2026, 15:07

Autor Tópico: Calculate Productivity rate: Formwork in construction  (Lida 389 vezes)

0 Membros e 1 Visitante estão a ver este tópico.

Online mitsumi

  • Sub-Administrador
  • ****
  • Mensagens: 135348
  • Karma: +0/-0
Calculate Productivity rate: Formwork in construction
« em: 12 de Julho de 2020, 12:08 »

Calculate Productivity rate: Formwork in construction
Video: .mp4 (1280x720, 30 fps(r)) | Audio: aac, 44100 Hz, 2ch | Size: 526 MB
Genre: eLearning Video | Duration: 7 lectures (53 mins) | Language: English

 Carpenters Man-hours data and calculation for rate of time per surface area obtained

What you'll learn

    My course will give a very simple way to understand how to estimate and calculate the productivity rate of carpenters working on formwork installation till dismantling in construction projects
    I will explain why and how i will calculate those productivity rates.
    I will give a real case project with real data collected from site and important method to calculate the needed productivity rates of labors
    All the explanations will be directly done on site Photos and Excel sheets calculation

Requirements

    The students or Engineers watching this course need to have little idea about construction, which mean that they need to know that in construction, wood or aluminum or even steel formwork is used as a tools to pour concrete inside.

Description

My course will give a very simple way to understand how to estimate and calculate the productivity rate of carpenters working on formwork installation till dismantling in construction projects, based on a real project already completed.

All the explanations will be directly provided based on site Photos and Excel sheets calculation formulas and site data information.

The project under study is a tower of 28 stories where i was directly involved in its construction.

Who this course is for:

    Any student learning civil Engineering, or already graduated and seeking to learn more about construction management.
    Other professionals like planners, estimators, project managers, developers, can also benefit from the information provided in this course to better understand the construction process and the site requirement.
Download link:
Só visivel para registados e com resposta ao tópico.

Only visible to registered and with a reply to the topic.

Links are Interchangeable - No Password - Single Extraction